USS Cavalla (SSN-684)

From Wikipedia, the free encyclopedia

USS Cavalla (SSN-684)
USS Cavalla (SSN-684) entering the harbor at Naval Station Pearl Harbor, Hawaii, on 1 January 1997 with Ford Island and the Arizona Memorial in the background.
History
United States
NameUSS Cavalla (SSN-684)
NamesakeThe cavalla, a salt-water fish
Ordered24 July 1968
BuilderGeneral Dynamics Electric Boat, Groton, Connecticut
Laid down4 June 1970
Launched19 February 1972
Sponsored byMrs. Melvin Price
Commissioned9 February 1973
Decommissioned30 March 1998
Stricken30 March 1998
MottoAny Mission, Any Time
Honors and
awards
Meritorious Unit Commendation[1]
FateScrapping via Ship and Submarine Recycling Program completed 17 November 2000
General characteristics
Class and typeSturgeon-class attack submarine
Displacement
  • 4,193 long tons (4,260 t) light
  • 4,498 long tons (4,570 t) full
  • 305 long tons (310 t) dead
Length302 ft 3 in (92.13 m)
Beam31 ft 8 in (9.65 m)
Draft28 ft 8 in (8.74 m)
Installed power15,000 shaft horsepower (11.2 megawatts)
PropulsionOne S5W nuclear reactor, two steam turbines, one screw
Speed
  • 15 knots (28 km/h; 17 mph) surfaced
  • 25 knots (46 km/h; 29 mph) submerged
Test depth1,300 feet (396 meters)
Complement110 (12 officers, 98 enlisted men)
Armament4 × 21-inch (533 mm) torpedo tubes

USS Cavalla (SSN-684), a Sturgeon-class submarine, was the second ship of the United States Navy to be named for the cavalla, a salt water fish. Although it was a Sturgeon class design, Cavalla was a modified "long hull" boat, approximately 10 feet (3.0 m) longer than the earlier ships in its class.

Construction and commissioning[edit]

The contract to build Cavalla was awarded to the Electric Boat Division of General Dynamics Corporation in Groton, Connecticut, on 24 July 1968 and her keel was laid down there on 4 June 1970. She was launched on 19 February 1972 sponsored by Mrs. Melvin Price, and commissioned on 9 February 1973, with Commander (later Admiral) Bruce DeMars in command.

Service history[edit]

Arrival at Pearl Harbor, 1980

Cavalla operated as part of Submarine Squadron Ten from January 1974 to March 1975, then with Submarine Development Squadron 12 at Submarine Base New London (Groton, CT) until 1978.[citation needed]

In October 1978, Cavalla arrived as part of the Pacific Submarine force, and in November 1978 entered the Puget Sound Naval Shipyard for a refit lasting until March 1980, when she moved to her new home port at Submarine Base Pearl Harbor at Pearl Harbor, Hawaii, where she was assigned to Submarine Squadron 1. Her operations from Pearl Harbor covered the globe, including the Atlantic, Pacific, Indian, and Arctic Oceans.

During her 1981 Westpac cruise ( January–June ) under Commander Fredric W. Rohm USN, Cavalla visited HMAS Stirling in Rockingham, Western Australia, for R&R from 15 to 22 April 1981.

In 1983, Cavalla became the first submarine to successfully perform dry deck shelter—a tank attached to the after deck back of the submarine allowing personnel to leave the submarine while submerged—operations in 1983.

During her Western Pacific deployment of 1985–1986, Cavalla supported critical dry deck shelter operations for SEAL team certification.[citation needed] She was awarded the Meritorious Unit Commendation for these operations.[citation needed] In addition to this award, her crew members also earned various U.S. Navy ceremonial certificates during this same deployment: "shellback" status for crossing the equator, the Order of the Ditch on two occasions for transiting the Panama Canal, the Domain of the Golden Dragon on two occasions for crossing the International Date Line, and the Order of the Spanish Main for operating in the Caribbean Sea.

In 1995, Cavalla deployed to the Arctic Ocean for civilian scientific research.

In 1996, Cavalla participated in the very first joint American-Japanese deep submergence rescue vehicle operation.

Decommissioning and disposal[edit]

Cavalla was decommissioned on 30 March 1998 and stricken from the Naval Vessel Register the same day. Her scrapping via the Nuclear-Powered Ship and Submarine Recycling Program at Puget Sound Naval Shipyard in Bremerton, Washington, was completed on 17 November 2000.

References[edit]

  1. ^ "Submarine Photo Index".

External links[edit]